Hoping someone can help with a TBC question. I have a lot of raw scans that were done in assumed (5000,10000) coordinate space, USFt, SF=1. I have since developed final adjusted State Plane Coordinates for the scan locations and want to move the scans to the SPC space. When I import the scans to the a TBC project in which the adjusted control points have already been added, the scans “ghost” about .3 to .9 feet. I have looked at the scans in the assumed space and they are fine, no ghosting. Scans were done with SX12 and I updated the assumed coordinates in the Total Station Editor to the final, SPC coordinates. Any ideas? thank you.